Skip to product information
1 of 11

Personalized Baby Announcement Sign - Lace Trim Design

Personalized Baby Announcement Sign - Lace Trim Design

A lace-trimmed wooden keepsake for their first hello, finished with a hand-tied chiffon ribbon.

Choose engraved lettering or a raised white acrylic first name. The optional second name is engraved.

  • Small: 4.5 × 5.75 inches
  • Large: 5.3 × 6.75 inches
  • Lightweight, 1/8-inch wood

Your sign will be made using the spelling and options submitted with your order. No separate mockup will be emailed. We may adjust name size and placement for a balanced design while keeping your chosen font and spelling. Please check all details before ordering. To request a change, email hello@simplycherishshop.com as soon as possible. Changes are only possible before physical production begins and are not guaranteed.

Natural wood grain and tone vary. Decorative photo prop only; not a toy. Use under adult supervision.

Processing & shipping

Most orders are ready to ship within 2 weeks of the order date. Shipping time is additional. Standard shipping typically takes 4–6 business days after dispatch.

Cancellations & order concerns

You may request cancellation within 24 hours of placing your order, provided physical cutting or printing has not begun. Because this item is personalized, returns and exchanges are not accepted. If there is an error, damage, or another issue with your order, contact us within 15 days of delivery with clear photos so we can help.

Regular price $18.99 USD
Regular price Sale price $18.99 USD
Sale Sold out
Shipping calculated at checkout.
Size
First Name Style
Font pairing

Details

Size & Materials

Shipping + Processing

FREE SHIPPING for orders over $35!

PROCESSING: Our current processing time is 2 weeks.

DELIVERY TIME: Please allow 5-8 days for delivery with standard ground shipping.

LARGE SIGNS: Regrettably, we are unable to offer free shipping for our large wall signs and photoboards to Hawaii, Alaska, American Samoa, U.S. Virgin Islands, Northern Mariana Islands, Puerto Rico and Guam. We will provide you with a shipping cost or cancel your order if we do not hear back from you within 3 business days.

Disclosure

This product is not intended to be a toy and should be used as a prop only under adult supervision. This listing is only for the sign; products shown in the sample photos besides the sign such as flowers, cake, ribbons, vessels, etc are used as props and not part of the listing. No other item(s) are shipped with your order unless it is included as part of the sign.

The front and back side of the sign is different in shade and grain; one side may be darker in shade and have more visible dark spots and knots. Although we use premium birch plywood, the wood’s natural properties such as variation in grain, texture and knots are not considered flaws and we do not attempt to cover them. No two items are identical.

Our signs are laser engraved and cut, and as a result occasional light burn marks may show. Each item is sanded down to remove burn marks and achieve a smooth surface. Minor cosmetic blemishes may occur from sanding, but this does not affect the performance of the product.

View full details